Skip to main content
Request Proposal
Field surveyor.

Case Study Limited Topo Exhibits in Limited Time

Field surveyor.

The Challenge

The scope of this project was to provide 1A certifications and limited topography exhibits for 70 locations throughout the city of Redmond. The client wanted all sites delivered by the end of the year, giving us 27 days during the holiday season.

We had all hands on deck, including Terrane’s founder, who computed the Right-of-Way locations. We coordinated the utility locating vendor to work in concert with our field crews to save time and to avoid losing utility paint marks during a rainy period. The drafter created the exhibits as fast as the crews could provide the data, and the tech placed the right of way calculations into the drawings before final review.

Having all these disciplines working simultaneously was no small feat. Not only did we meet our goal, but we beat it by two days.

The Results

  • Coordinated and communicated effectively to deliver on our promises
  • Demonstrated flexibility in having several people dedicated to the project
  • Ensured due diligence and managed a very tight schedule while thinking outside the box to ensure the project’s success

We have true professionals that are diverse in their skillsets. This allows Terrane to form teams that can deliver faster while maintaining a high-quality standard.

WHAT’S YOUR MEASURE ? Get a quote.

Terrane | Related Case Studies

Drawing the Line

Terrane | Doing

We Are the Measure

“Having all these disciplines working simultaneously was no small feat. Not only did we meet our goal, but we beat it by two days.”

What's Your Measure ?

Get a quote.
Back to top of page